Project Intro

Fitout focused around partitioning.  The project included bathroom partitions, vinyl planks installation and office fitout partitioning delivered on time and on budget.

The Challenge We Faced

The primary obstacle in this project was the urgency to meet the client’s completion date with short notice. Faced with timing roadblocks from a previous supplier the delays encountered meant we quote and delivery the job in a short timeline.

Our Solution To The Challenge We Faced

To tackle the time-sensitive issue, we leveraged our in-house flooring installers and flooring suppliers who stock their products locally in Western Australia. Additionally, our extensive network of build teams enabled us to assemble a dedicated team promptly.

How We Completed This Office Fitout

Our comprehensive solution encompassed the provision of high-quality flooring, aluminium glazing track, glazing materials, and compliant bathroom partitioning with signage. The collaborative efforts of our various teams ensured a seamless and integrated approach, overcoming the challenges posed by the tight timeline. Compliant signage was a part of the bathroom fitout.

Conclusion

The collective efforts resulted in a project completed to perfection, with thanks to our wonderful trades. The quick turnaround, coupled with our team’s dedication, not only met but exceeded the client’s expectations, demonstrating our ability to navigate challenges and deliver excellence.